Duration of Works: February, 2016 – June, 2016
DonLow Construction Ltd was responsible for the supply of all necessary labour, plant and Materials required to carry out the works and these works involved the following:
Bulk Excavation to reduced levels
Road Construction Works - Terram, Capping and Cl804 stone
Installation of Services – ESB, Public Lighting, Eircom, HDPE Watermain
Storm Drainage, Gullies, Man-holes and Attenuation Tanks
Slipform Kerbing
Landscape works
Duration of Works: March, 2014 – September, 2015
Cellars Works
These works involved the following and were carried out on Parnell Street, Marlborough Street, Dawson Street and Nassau Street.
Breaking through cellar roof and supporting with temporary works
Cleaning out all materials within the cellars
Ducting of existing services within the cellar
Building of Blockwork to close off cellar access
Filling of Cellars with DaraFill Concrete
Plastering of Blockwork on property side if required
Service Diversion Works
These works were carried out on Marlborough Street and O’Connell Street and involved the following:
Excavation of Slit trenches to prove routes for services
Excavation of trenches of various widths to install various services
Installation of Ducting in various formations in various locations
Installation of Various HDPE Watermains up to 355mm and associated HDPE and Ductile fittings
Construction of Various Utility Chambers in both blockwork and Cast In Sitiu
Installation of precast and cast in sitiu Kerbing
Reinstatement of various surfaces in Concrete, Macadam and Paving
These works involved the following:
Setting up of traffic Management
Excavation of Slit trenches to find the cellars
Breaking through cellar roof and supporting with temporary works
Cleaning out all materials within the cellars
Ducting of existing services within the cellar
Moving of Broadstrap Man-holes
Building of Blockwork to close off cellar access
Filling of Cellar with DaraFill Concrete
Plastering of Blockworks on property side if required
Reinstatement of Works to match existing
Duration of Works: December, 2014 to January, 2015
DonLow carried these works out on a PSCS Role and they involved the following:
Removal of existing kerbing and installation of new precast kerbs to reduce road width and to maximize the parking area in front of the school.
Relocation of all Drainage gullies to line of new kerbing
Installation of a controlled Pedestrian Crossing
Installation a Raised Platform/DBM Speed Ramp
Laying of DBM Surfacing using both Machine Lay and Hand-lay
Duration of Works: February, 2015
DonLow carried these works out on a PSCS Role and they involved the following:
Traffic Management and PSCS Role
Removal of existing kerbing and installation of new precast kerbs to provide footpath and defined parking area in front of the school
Construction of New DBM Footpath
Renewal of DBM Surfacing on Existing DBM Footpath
Construction of New Pedestrian Access Points to the School
These works involved the following over the course of numerous contracts.
Excavation of spot patches at various locations along the road
Installation of Various drainage Systems
Renewal of Existing Footpathes in both concrete and DBM finish
Installation of Precast, Cast-In-Sitiu and Slipform Kerbing
Laying of Watermains
Laying of Ducting
Installation of Traffic Calming Systems
Road resurfacing works
Raising of Street furniture using Mastic Asphalt
Installation of Concrete and Mastic Asphalt drainage channels
DonLow Construction Ltd carries out these works for various contractors and Local Authority bodies throughout Dublin, Wicklow, Carlow, Wexford, Kilkenny, Offaly, Kildare, Meath, Westmeath, Laois and Louth.